Question Details
Hickory Company manufactures two productsAc???14,000 units of
Product Y and 6,000 units of Product Z. The company uses a
plantwide overhead rate based on direct labor-hours. It is
considering implementing an activity-based costing (ABC) system
that allocates all of its manufacturing overhead to four cost
pools. The following additional information is available for the
company as a whole and for Products Y and Z:
|
Activity Cost
Pool | Activity
Measure |
Estimated Overhead Cost |
Expected Activity | ||
Machining | Machine-hours | $ | 200,000
| 10,000 | MHs |
Machine setups | Number of setups | $ |
100,000 | 200 | setups |
Production
design | Number of products | $ |
84,000 | 2 | products |
General factory | Direct labor-hours | $ | 300,000
| 12,000 | DLHs |
Activity
Measure | Product Y | Product Z |
Machine-hours | 7,000 | 3,000 |
Number of
setups | 50 | 150 |
Number of
products | 1 | 1 |
Direct
labor-hours | 8,000 | 4,000 |
rev: 10_24_2014_QC_57437
1.
value:
0.66 points
Required: |
What is the companyAc??cs plantwide
overhead rate? |
ask your instructor a questioncheck my workreferencesebook &
resources
2.
value:
0.66 points
Required: |
Using the plantwide overhead rate, how much manufacturing
overhead cost is allocated to Product Y and Product Z?
|
ask your instructor a questioncheck my workreferencesebook &
resources
3.
value:
0.66 points
Required: |
What is the activity rate for
the Machining activity cost pool? |
ask your instructor a questioncheck my workreferencesebook &
resources
4.
value:
0.66 points
Required: |
What is the activity rate for
the Machine Setups activity cost pool? |
ask your instructor a questioncheck my workreferencesebook &
resources
5.
value:
0.66 points
Required: |
What is the activity rate for
the Product Design activity cost pool? |
ask your instructor a questioncheck my workreferencesebook &
resources
6.
value:
0.66 points
Required: |
What is the activity rate for
the General Factory activity cost pool? |
ask your instructor a questioncheck my workreferencesebook &
resources
7.
value:
0.66 points
Required: |
Which of the four activities is
a batch-level activity? |
General factory activity | |
Machine setups activity | |
Product design activity | |
Machining activity |
ask your instructor a questioncheck my workreferencesebook &
resources
8.
value:
0.66 points
Required: |
Which of the four activities is
a product-level activity? |
Machining activity | |
Product design activity | |
General factory activity | |
Machine setups activity |
ask your instructor a questioncheck my workreferencesebook &
resources
9.
value:
0.66 points
Required: |
Using the ABC system, how much total manufacturing overhead cost
would be assigned to Product Y? (Do not round intermediate
calculations.)
|
rev: 10_24_2014_QC_57437
ask your instructor a questioncheck my workreferencesebook &
resources
10.
value:
0.66 points
Required: |
Using the ABC system, how much total manufacturing overhead cost
would be assigned to Product Z? (Do not round intermediate
calculations.)
|
rev: 10_24_2014_QC_57437
ask your instructor a questioncheck my workreferencesebook &
resources
11.
value:
0.66 points
Required: |
Using the plantwide overhead
rate, what percentage of the total overhead cost is allocated to
Product Y and Product Z? (Round your "Percentage" answer to
1 decimal place. (i.e. .1234 should be entered as
12.3)) |
ask your instructor a questioncheck my workreferencesebook &
resources
12.
value:
0.66 points
Required: |
Using the ABC system, what
percentage of the Machining costs is assigned to Product Y and
Product Z? |
ask your instructor a questioncheck my workreferencesebook &
resources
13.
value:
0.66 points
Required: |
Using the ABC system, what
percentage of Machine Setups cost is assigned to Product Y and
Product Z? |
ask your instructor a questioncheck my workreferencesebook &
resources
14.
value:
0.66 points
Required: |
Using the ABC system, what
percentage of the Product Design cost is assigned to Product Y and
Product Z? |
ask your instructor a questioncheck my workreferencesebook &
resources
15.
value:
0.76 points
Required: |
Using the ABC system, what
percentage of the General Factory cost is assigned to Product Y and
Product Z? (Round your "Percentage" answer to 1 decimal
place. (i.e. .1234 should be entered as 12.3)) |
Solution details:
Answered
QUALITY
Approved
ANSWER RATING
This question was answered on: Dec 08, 2020
Solution~000652147654033.zip (25.37 KB)
This attachment is locked
We have a ready expert answer for this paper which you can use for in-depth understanding, research editing or paraphrasing. You can buy it or order for a fresh, original and plagiarism-free solution (Deadline assured. Flexible pricing. TurnItIn Report provided)

Pay using PayPal (No PayPal account Required) or your credit card . All your purchases are securely protected by .
About this Question
STATUSAnswered
QUALITYApproved
DATE ANSWEREDDec 08, 2020
EXPERTTutor
ANSWER RATING
GET INSTANT HELP/h4>
We have top-notch tutors who can do your essay/homework for you at a reasonable cost and then you can simply use that essay as a template to build your own arguments.
You can also use these solutions:
- As a reference for in-depth understanding of the subject.
- As a source of ideas / reasoning for your own research (if properly referenced)
- For editing and paraphrasing (check your institution's definition of plagiarism and recommended paraphrase).
NEW ASSIGNMENT HELP?
Order New Solution. Quick Turnaround
Click on the button below in order to Order for a New, Original and High-Quality Essay Solutions. New orders are original solutions and precise to your writing instruction requirements. Place a New Order using the button below.
WE GUARANTEE, THAT YOUR PAPER WILL BE WRITTEN FROM SCRATCH AND WITHIN A DEADLINE.
